DPT Drilling, Soil and Water Sampling and Installation of Temporary Monitoring Wells
1275 Oakbridge Parkway, Lakeland – New Commercial Development
ATI Companies Drilling Team completed a DPT Drilling for Soil and Water Sampling and Installation of Temporary Monitoring wells project at a new commercial development site in Lakeland, Florida. It also included the collection of multiple soil and groundwater samples at all borings and MW ’s locations.
Using a Geoprobe 6620 DT, Ambient Technologies, Inc. (ATI) was able to accomplish the required Scope Of Work which included three soil borings to 10 feet and the installation of three 2-inch Temporary Monitoring Wells to 15 feet. Hand cleared to 5 feet and Macro Core to Total Depth. Monitoring Wells required development of up to 30 minutes. Decontamination of drilling equipment between samples was required.
Left the site ready for a second mobilization to remove and Abandon the Temporary Monitoring Wells within 10 days.
Project Services
- 3 SB to 10 feet. Hand clear to 5 feet and Macro Core to TD. Plug and patch once completed.
- Install three 3 Temp. wells to 15 feet. Wells are 1" with 10 feet of prepack screen. Hand clear to 5 ft and macro core to TD
- Second mobilization to remove/abandon temp. wells within 10 days
Contact: Scott D. Graf, P.G.- TERRACON - e-mail scott.graf@terracon.com Tel. (813) 321-0321. Address: 5463 W. Waters Avenue, Suite 830, Tampa, Florida 33634